Saturday, 14 January 2012

Day 325 - Plan B

We headed off in the morning to put in new ceiling lining and insulation in a rain damaged house. The roof leaked after the Feb 22 quakes. The house also needs another exterior coat of paint.

The owner wasn't home and it turned out she was very sick, so Plan B!

Susan, Mike, Michael and Stu headed back to Parlane St to do backup jobs.
  • Trimmed up logs with chainsaw
  • Mulched tree prunings
  • Cut scaffolding pipe to 3m lengths
  • Cut tree stumps flush with ground
The original jobs will now be done next Saturday.

0 comments:

Post a Comment